Welcome to the official website of Xidi laboratory, the laboratory design and decoration recognize Xidi!
|
|
Home >> News >> Technology
文章出处:Technology|阅读量:403|发表时间:2021-03-04
China is a truly large agricultural country. The advantages of a country with a large population have absolute advantages in agricultural development. No matter how the times develop, my country's national conditions will not allow the development of agriculture to be abandoned. Most of the current agricultural planting is contracted. Planting institutions are paying more and more attention to cost, yield and quality. The era of new agricultural production relying only on labor has passed, and the development of smart agriculture is inseparable from the advancement of modern production tools. In this article, CEIDI Xidi will discuss the construction of pesticide preparation workshops, and study new models of modern agricultural workshops. In the past, the construction of traditional pesticide workshops involved planting organizations looking for design engineers, purchasing equipment companies, and construction units to construct the workshops in three independent stages. The three stages were carried out separately, which caused waste in terms of manpower, construction period and cost. At present, in the agricultural preparation industry, CEIDI believes that these three links can be integrated, and the EPC model is adopted for the design and construction of pesticide plants to ensure that each link will not be separated. This is also a good way to scientifically accelerate the process of agricultural development. .
At present, most domestic pesticide preparation manufacturers are comprehensive processing companies. The products they produce include insecticides, fungicides, herbicides, etc., which can be classified according to the dosage form and can also be divided into liquid preparations (emulsifiable concentrates, water emulsions, microemulsions, water suspensions, oil-based products). Dispersing suspension agents, etc.), solid preparations (wettable powders, water dispersible granules, etc.).
Before designing, we first determine the output of pesticide preparations, optimize and determine the process route according to the required output, and conduct research on the production equipment. In terms of production process, you need to consider: 1. The required production flow, temperature, pressure and other parameters. The effects achieved in several routes are similar, and priority is given to routes that are easy to achieve operating parameters; 2. Investment; 3. Energy consumption; 4. Safety; 5. Environmental protection; 6. Material requirements; 7. Product quality; 8. Whether Infringement.
The construction of the pesticide plant should refer to the risk factor of the product, and the decoration design should refer to the construction standards of the chemical laboratory and must be carried out in accordance with the requirements of the relevant architectural design standards.
1. Room division: According to the purpose of the chemical laboratory, it usually includes the analysis room, the instrument room, the spectrum room, the balance room, and the pure water room.
2. Construction requirements:
Including room location, floor height size, room requirements, door requirements, window requirements, wall requirements, floor and floor requirements these seven parts.
①The location of the room: the equipment with heavy weight or anti-vibration requirements is placed on the ground floor; the orientation of the room is determined according to actual needs; the rooms with noise prevention requirements are placed on the upper floor.
②Floor height size: If the chemical laboratory needs a suspended ceiling, the floor height must be increased accordingly.
③Room requirements: such as cleanliness, temperature and humidity, noise prevention, shock resistance, fire resistance, and corrosion resistance, these are all important index requirements.
④ Door requirements: it needs to be considered from the aspects of opening inward and outward, one-way spring and two-way spring, sound insulation, heat preservation, shielding, and automation.
⑤Window requirements: it needs to be considered from the aspects of opening direction, partial opening, single and double layer structure, shading, fixation, and airtightness.
⑥Wall wall requirements: It needs to be considered from the aspects of wall skirt height, acid and alkali resistance, heat insulation, sound absorption, sound attenuation, shielding, and color.
⑦Floor floor requirements: it needs to be considered from the aspects of cleanliness, rainproof, anti-skid, anti-static, anti-radioactive pollution, sound insulation, and dryness.
Pesticide preparation factory (workshop) is a relatively special small part of the design of fine chemical enterprises. Its design is different from the design of oil, natural gas and chemical synthesis. It is a comprehensive design that integrates many aspects of technology. In use, reagents and drugs such as acids, alkalis, and organic solvents will be used; glassware such as test tubes, flasks, beakers, condensers, etc.; precision instruments such as atomic absorption, gas chromatography, liquid chromatography, and ultraviolet spectrophotometers, as well as ovens and horses. Furnace and other high-temperature equipment. In addition to higher requirements for operators, the design must take "practicality, safety, and environmental protection" as the starting point, comprehensively consider the safe operation requirements of various instruments and equipment, and configure corresponding laboratory furniture and equipment with characteristics such as corrosion resistance and wear resistance.
CEIDI Xidi, a clean system EPC service provider with the advantage of "one-stop clean system overall solution platform", has great advantages in the design and construction of such chemical laboratories. They focus on laboratories and clean industrial decoration. The field has been continuously deepened for more than ten years, and has accumulated rich industry experience in the laboratory and clean field. Its designers have rich experience in chemical laboratory design and upgrades. The construction team has more than eight years of qualifications. At the same time, it has its own laboratory furniture, The board production plant brings better matching furniture and facilities for chemical laboratories to enterprises. Create a fully functional, safe and comfortable, green and environmentally friendly laboratory space for our customers.